Below is a list of our case studies;
An Extreme Dropped Object Case Study
This case is of course not your day to day example of a Dropped Object; it's probably something of a one off, however it demonstrates...
View case study ›
EnQuest’s Thistle Platform Power Upgrade Project
15th Mar 2013
DSL were contracted by Wood Group PSN (WGPSN) on behalf of independent development and production company EnQuest to carry out the installation of a new...
View case study ›
Retrofit of Pipe Handling Systems
18th Dec 2013
DSL are constantly engaged in a range of drilling structure upgrade, refurbishment, recertification and inspection work scopes on an on-going basis Worldwide. The following...
View case study ›
Drilling Package Upgrades
DSL are constantly involved in supporting our customers with a variety of work scopes associated with the upgrade, repair and refurbishment of Derrick Equipment Sets,...
View case study ›
DSL Singapore Fast Response
06th Aug 2014
Our Singapore fabrication facility was recently put to the test to get a customer back to work after having damaged their A Frame/Cantilever Legs on...
View case study ›
Haliburton Rig Condition Survey
06th Jul 2015
Halliburton has engaged DSL in a two year contract to carry out a variety of inspection, survey and associated services on 4/5 land rigs...
View case study ›
CORROSION OF HOLLOW SECTION MEMBERS ON OFFSHORE DRILLING STRUCTURES
01st Apr 2016
SAFETY ALERT – March 2016

1. TOPIC: CORROSION OF HOLLOW SECTION MEMBERS ON OFFSHORE DRILLING STRUCTURES

2. WHAT HAPPENED – Risk to Rig Operations
During the periodical Inspection of...
View case study ›
Removal of Redundant Boat Bumper Bars
20th Oct 2016
DSL Offshore Construction Crew have successfully completed the removal of redundant Boat Bumper Bars from the Petrofac Platform 48-29C in the Southern North Sea, as...
View case study ›