Enquest’s Thistle Platform Power Upgrade Project

21st September 2016
  • Projects

DSL were contracted by Wood Group PSN (WGPSN) on behalf of independent development and production company EnQuest to carry out the installation of a new gas turbine generator package exhaust stack and support tower as part of EnQuest’s Thistle Platform Power Upgrade Project. The Power Upgrade Project is the first of five discreet themes currently being executed by EnQuest as part of the Thistle Late Life Extension Project (LLX). The Thistle Platform is located in the North Sea, 218 km North of Shetlands.

The project team, comprising specialists from EnQuest and WGPSN, in conjunction with platform operations and DSL, undertook design and construction safety reviews of the exhaust stack and support tower installation activities and identified that installation by rope access would be the safest method of installation. In addition to the complexity of the offshore installation, the project team recognised the need to carry out an onshore trial assembly of the exhaust stack and support tower and this was completed at Montrose Harbour South Base (See attached photograph).

The project team enlisted DSL to assist with the trial assembly, and to replicate all anticipated activities that would be encountered during the offshore installation phase. Work on Phase 1 of the onshore trial assembly was undertaken in early September, and was carried out in a disciplined, controlled and safe manner.

On completion of the trial assembly, DSL received the following commendation from the project team which reflects the safe and professional manner in which DSL performed their activities:
“Thanks to the DSL team for an excellent job, carried out in a safe, sound, and very professional manner in conjunction with the Project Team. This was an excellent example of a collaborative approach, with a great team spirit – here’s hoping the weather is kind for the offshore installation phase.”

The offshore phase of the work scope commenced in late September and despite the constraints of the weather, the installation of the exhaust stack, support tower, and tie back restraints was once again carried out in a safe, professional manner with no incidents.

On completion of the offshore installation the project team sent further praise to the DSL personnel:
“This major milestone for the Thistle Power Upgrade, as confirmed by the OIM’s note, has been executed in a safe and controlled manner.
The project team would like to thank everyone involved for their patience and excellent team work which has contributed significantly to the successful implementation of this key piece of work.
Please convey our thanks to the DSL / Hydrus / SEL teams who have been working alongside the project team and Hydrus since the start of the work at Montrose Harbour.”

Call us for more info on: +44(0)1493 669141

< Back to case studies studies archive

Products & Services

DSL Offshore Offices Map DSL Head Office DSL Dubai, Uae DSL India DSL Norway

Contact Us

For more information on any of the services listed on our website, Employment enquiries should be submitted via the Job alerts or Recruitment pages .
Any CV's sent to other email addresses are automatically deleted.

OUR OFFICES

DSL is an international company with offices around the globe. Please see the map or the list below to find your nearest office

Head Office

Falcongate House
Faraday Road
Harfreys Industrial Estate,
Great Yarmouth
Norfolk, NR31 0NF
Tel: +44 (0) 1493 669141
Fax: +44 (0) 1493 668409
Email: enquiries@derricksl.com

Dubai, UAE

Derrick Services MENA FZE
Plot HD-17, PO Box 49945
HAMRIYAH FREE ZONE 1
SHARJAH
UAE
Tel: +971 (0) 06 552 0040
Fax: +971 (0) 06 562 1417
Email: enquiries@derricksl.com

India

Derrick Services India Private Limited,
7th Floor, 701, Powai Plaza,
Hiranandani Gardens, Powai
Mumbai City, Maharashtra – 400076

Tel: +91 484 4061000
Fax: +91 484 4060363
Email: enquiries@derricksl.com